Economic analysis of solar photovoltaic power plant planning at Taman Melati Depok Apartment

Authors

  • Roma Dhona Department of Electrical Engineering, Faculty of Engineering, Universitas Indonesia, Indonesia
  • Rinaldy Dalimi Department of Electrical Engineering, Faculty of Engineering, Universitas Indonesia, Indonesia

DOI:

https://doi.org/10.24036/jptk.v6i2.32823

Keywords:

Pvsyst, COE, NPV, PI, DPP

Abstract

Currently, Indonesia is still using fossil fuel power plants. The high use of fossil fuels will harm the environment, therefore to reduce the use of fossil fuels, it is necessary to develop renewable energy power plants, one of which is a solar photovoltaic power plant. This study discusses the economic analysis of planning a soalr photovoltaic power plant at the Taman Melati Depok Apartment which is connected to the PLN network with the PVsyst software. This PLTS plan will be built on the roof of the apartment using an area of 437 m2 with generated power of 90,400 Wp. Using solar modules with a capacity of 565 Wp as many as 160 modules. This PLTS can generate electricity per year 116600 kWh/year. The Cost of Energy (COE) for this PLTS is Rp.735.39/kWh. Economic analysis uses Net Present Value (NPV), Profitability Index (PI), and Discounted Payback Period (DPP) to determine whether this PLTS is feasible or not. Based on the calculation result, the NPV value is Rp. 608,793,939.29, while the PI value is 1.587 and the DPP value is around 12 years and 9 months, which is faster than the project age, which is 30 years. Thus the investment in the Taman Melati Apartment PLTS project is feasible to continue.  

Downloads

Download data is not yet available.

References

Asrori., Fajar, A,R., Pipit, W&Irwan,H,E. (2022). Kajian Kelayakan Solar Rooftop On Grid Untuk Kebutuhan Listrik Bengkel Mesin di Polinema. Jurnal Teknik Energi Listrik, Teknik Telekomunikasi &Teknik Elektronika. Vol.10,No.4. 830-845. http://dx.doi.org/10.26760/elkomika.v10i4.830

Bank Indonesia. (2023). Rapat Dewan Gubernur Bank Indonesia 2023 Tentang BI 7-Day Reverse Repo Rate.

Dyah, A,K,S.,Fransisco, D,W.,Husni,R,A.(2022).Optimasi Sistem Pembangkit Listrik Tenaga Hybrid di Pulau Enggano. Jurnal Nasional Teknik Elektro dan Teknologi Informasi. Vol.11, No. 2.

I Kadek, H,W., I Nyoman, S,K& Wayan, G,A.(2022). Analisa PLTS Atap 25 kWp On Grid Kantor DPRD Provinsi Bali. Jurnal Spektrum. Vol. 9, No. 2 Juni 2022.

Outlook Energi,B. (2022). Indonesia Energy Transition Outlook Tentang Upaya Pencapaian Target Pengembangan Energi Baru Terbarukan dan Percepatan Transisi Energi Menuju Net Zero Emission.

Putranto, L.,M.,Widodo,T., Indrawan H., Ali Imron, M.,&Rosyadi, S.A. (2022). Grid Parity analysis: The present state of PV rooftops in Indonesia. Renewable Energy Focus, 40, 23-38. http://doi.org/10.1016/j.ref.2021.11.002.

Rafli.,Jumiati,I.,&Sardi,S.(2022).Perencanaan dan Studi Kelayakan PLTS Rooftop Pada Gedung Fakultas Teknik UNG. Jambura Journal of Electrical and Electronics Engineering. Vol.4, No.1.

Ryan, H,B., Budi, S., Fariz, M,R.,&Agus, R,U.(2022). Techno-economic Analysis of Solar Photovoltaic Power Plant for Mass Transportation Integrated Apartment. The 7th International Engineering Student Conference.

Yakobus Karingan.,&Joni. (2022). Perencanaan dan Analisa Ekonomi Pembangkit Listrik Tenaga Surya Rooftop dengan Sistem On Grid sebagai Catu daya Tambahan pada RSUD Kabupaten Mimika. Jurnal Pendidikan Tambusai. 3763-3773.

Downloads

Published

2023-05-31

How to Cite

Dhona, R., & Dalimi, R. (2023). Economic analysis of solar photovoltaic power plant planning at Taman Melati Depok Apartment. Jurnal Pendidikan Teknologi Kejuruan, 6(2), 98–105. https://doi.org/10.24036/jptk.v6i2.32823