Hadi, E. and Setiabudy, R. (2023) “Analysis of technical and economics overhead transmission line 150 kV construction from mine mouth coal fired power plant to external customer substation”, Jurnal Pendidikan Teknologi Kejuruan. Padang, Indonesia, 6(2), pp. 64–69. doi: 10.24036/jptk.v6i2.32723.