1.
Amrico H, Dalimi R. Economic analysis of waste power plants based on the economic scale -Case study Merah Putih waste power plant. JPTK [Internet]. 31May2023 [cited 3Jul.2024];6(2):156-62. Available from: http://jptk.ppj.unp.ac.id/index.php/jptk/article/view/332