1.
Hadi E, Setiabudy R. Analysis of technical and economics overhead transmission line 150 kV construction from mine mouth coal fired power plant to external customer substation. JPTK [Internet]. 28May2023 [cited 3Jul.2024];6(2):64-9. Available from: http://jptk.ppj.unp.ac.id/index.php/jptk/article/view/327