Hadi, Elpatra, and Rudy Setiabudy. 2023. “Analysis of Technical and Economics Overhead Transmission Line 150 KV Construction from Mine Mouth Coal Fired Power Plant to External Customer Substation”. Jurnal Pendidikan Teknologi Kejuruan 6 (2), 64-69. https://doi.org/10.24036/jptk.v6i2.32723.