Hadi, E., & Setiabudy, R. (2023). Analysis of technical and economics overhead transmission line 150 kV construction from mine mouth coal fired power plant to external customer substation. Jurnal Pendidikan Teknologi Kejuruan, 6(2), 64-69. https://doi.org/10.24036/jptk.v6i2.32723