(1)
Hadi, E.; Setiabudy, R. Analysis of Technical and Economics Overhead Transmission Line 150 KV Construction from Mine Mouth Coal Fired Power Plant to External Customer Substation. JPTK 2023, 6 (2), 64-69. https://doi.org/10.24036/jptk.v6i2.32723.